Qualification Required:
- 2-3 years experience.
- Preferred background – Under graduates/Postgraduates in Master of social work, B.A Agriculture, B.Sc., Agriculture, MADA, Development studies or other related fields.
Roles and Responsibilities
1. Project Planning & Coordination
- Assist in the planning and execution of water body rejuvenation activities (desilting, dredging, waste removal, plantation, etc.).
- Coordinate with engineers, contractors, and labourers to ensure smooth on-ground operations.
- Ensure work is carried out as per the approved project timeline and quality standards.
2. Machinery & Equipment Management
- Maintain a detailed record of machinery deployed (excavators, JCBs, tractors, pumps, etc.), including:
- Machine type, capacity, and ownership details (rented/owned).
- Daily usage logs (hours operated, fuel consumption, maintenance needs, etc).
- Ensure proper deployment and optimal utilization of equipment.
3. Field Monitoring & Reporting
- Document field activities with photographs, GPS coordinates, and measurements (before/after work).
- Prepare daily/weekly reports on:
- Work progress (area covered, volume of silt removed, waste cleared).
- Labor and machinery productivity.
- Challenges faced (weather delays, resource shortages, etc).
4. Stakeholder & Community Engagement
- Liaise with local authorities, community leaders, and landowners for permissions and cooperation.
- Address grievances from local residents regarding project activities.
- Conduct awareness sessions on water conservation and community participation.
5. Safety & Compliance
- Ensure all workers and operators follow safety protocols (PPE, machine handling, waste disposal).
- Monitor environmental compliance (proper silt disposal, no chemical contamination).
- Report accidents/incidents immediately to the Project Manager.
6. Data Collection & Documentation
- Maintain accurate records of
- Labor attendance and wages, etc.
- Material usage (plants, silt bags, fuel, etc).
- Water quality test results (if applicable).
- Submit periodic reports to the Project Manager with recommendations.
7. Problem-Solving & Troubleshooting
- Resolve on-site issues (machine breakdowns, conflicts, delays) proactively.
- Escalate critical concerns (fund shortages, legal hurdles) to higher authorities.
Key Performance Indicators (KPIs)
- Adherence to project timelines.
- Machinery utilization efficiency.
- Accuracy and timeliness of reporting.
- Compliance with safety/environmental norms.
- Community feedback and conflict resolution.
Job Type: Full-time
Pay: ₹25,000.00 - ₹30,000.00 per month
Benefits:
- Provident Fund
Schedule:
- Day shift
Work Location: In person
Expected Start Date: 15/06/2025